Logistics is part of production continuity
Transport delays can affect material movement, workforce productivity and downstream schedules. Planning should therefore be linked to the site’s operating rhythm.
Build the daily plan
Review expected volume, loading capacity, vehicle availability, route conditions, access timings and unloading arrangements.
Maintain visibility
A simple dispatch tracker can record vehicle, time, quantity, destination and status. Exceptions should be escalated quickly when they affect the plan.
Documentation matters
Movement records and project-specific documents should be maintained as required by contract and applicable regulations.
Effective logistics is less about isolated vehicle movement and more about synchronising transport with site capacity and operational priorities.